Latest Entries »
The Nicola Valley Aquatic Center is having a new years eve ( after noon swim.) The swim will be on December 31st from 1 -3 PM at he facility on Mamette avenue in Merritt.
There is no charge for the swim and the pool is in walking proximity to 5 EV charging stations some of which take 2 hours to recharge an EV.
Today in history,December 30th 1948
The Tony award winning Kiss me Kate opens at the Cole Porter theater.
Tuesday, December 23rd is the last day for school a the local college, the facility opens again on January 5 2015. The local community college is used by many community users and is open to the public ( library ) on a triage basis. (student preference).
Today in history: December 18th 1999
Nasa launches its Terra platform.
The Petro Canada is showing an offering of 1.09 a liter for regular gasoline at the pumping station at the junction of Highway 8 and 5A. There has been a dramatic drop in prices at the pumps in the last few weeks coming from mid $1.30 a liter to todays low. Petro Canada also offers a loyalty card program that gives you another 12 cents a liter making it possible to get regular gasoline at under the dollar a liter range. The CIBC is reporting that Canada has lost 5 billion in revenue in the recent drop in prices. We take that as lost revenue from exports. To balance the net benefit of lower gas prices to the consumer we must assume that a drop in price is a more broadly fare benefit to more people domestically then lost export revenue. Today in History: December 17th 1935 The DC-3 aircraft makes its first flight.
Hoar frost was caused by high humidity and freezing temperatures on Sunday. This gave the citizens of Merritt a wonderful display.
Frost is the term for several types of coatings or deposits of ice that may form in humid air in cold conditions, usually overnight. In temperate climates it most commonly appears as fragile white crystals or frozen dew drops near the ground, but in cold climates it occurs in a greater variety of forms.[1]
Frost is known to damage crops or reduce future crop yields, therefore farmers in those regions often invest substantial means to prevent its forming. source wikipedia.
Rain and above freezing weather came up from the west behind the humidity, however we were treated to a display on Sunday. The long rang forecast calls for snow before Christmas an moderate sub zero temperatures.
Today in history: December 11th 1972
The sixth and final landing on the moon is made by Apollo 17.
The Lacrosse rink on Voght street is taking form with red and blue lines marked and back boards going up. The rink will be having overhead lighting before being completed sometime in January 2015
Today in History: December 10 th 1901
The first Nobel Peace Prize is awarded.
The Pipeline filed their submission a year ago and our experience with the operators of the line over the last 60 years has been good , they have been presenting the economic benefits of the line. A copy of the filed submissions is in the quote below, remember these are construction jobs and benefits to most interested while there was a boom here with the first line it worked out to one permanent employee here then automation took that one away. Construction crews are often moved from project to project but the wise would lobby for lasting jobs by offering what it takes to attract either construction workers or maintenance people with amenities.
On December 16, 2013, Trans Mountain filed a Facilities Application for the Trans Mountain Expansion Project. This webpage is not intended as a substitute for the actual content of the submission. Volume 2 of the Application provides a full description of the Project. To view all eight volumes of the Application, click here. As the world’s third-largest oil producer, Canada benefits greatly from the export of national resources. Twinning the Trans Mountain Pipeline will increase Canada’s capacity to export these resources by facilitating the movement of oil to the West Coast for marine transport to market. It will further secure the supply of oil products to the Lower Mainland for use by BC’s residents and businesses. The project will also lead to new jobs in the short and long term, job-related training opportunities, and increases in taxes collected through all three levels of government.
The $5.4 billion pipeline project will increase the value of Canadian oil by unlocking access to world markets. The combined minimum fiscal impact for construction and the first 20 years of expanded operations is $18.5 billion including federal, provincial and municipal tax payments that can be used for public services such as health care and education. British Columbia receives $2.1 billion; Alberta receives $9.6 billion, and the rest of Canada shares $6.8 billion. Municipal tax payments (not adjusted for inflation) total $922 million to BC and $124 million to Alberta over the first 20 years of expanded pipeline operations. Direct capital spending for the construction phase of the project includes $3.8 billion to British Columbia and $1.6 billion to Alberta. At the peak of construction, 4,500 people will be working on the pipeline expansion. The expansion will also create approximately 3,000 direct, indirect and induced jobs per year during operations. Overall the Project generates a minimum of 108,301 direct, indirect and induced person-years of employment during project development and operations. British Columbia’s share is 66,132 person-years including 35,864 during project development and 30,269 during operations. Alberta’s share is 24,926 person-years including 14,632 during project development and 10,293 during project operations.
Good luck to all that want a live an livelihood and peace to enjoy it.KDG
Today in History: December 9th 1962
The Petrified Forest National Park is established in Arizona.







The $5.4 billion pipeline project will increase the value of Canadian oil by unlocking access to world markets. The combined minimum fiscal impact for construction and the first 20 years of expanded operations is $18.5 billion including federal, provincial and municipal tax payments that can be used for public services such as health care and education. British Columbia receives $2.1 billion; Alberta receives $9.6 billion, and the rest of Canada shares $6.8 billion. Municipal tax payments (not adjusted for inflation) total $922 million to BC and $124 million to Alberta over the first 20 years of expanded pipeline operations. Direct capital spending for the construction phase of the project includes $3.8 billion to British Columbia and $1.6 billion to Alberta. At the peak of construction, 4,500 people will be working on the pipeline expansion. The expansion will also create approximately 3,000 direct, indirect and induced jobs per year during operations. Overall the Project generates a minimum of 108,301 direct, indirect and induced person-years of employment during project development and operations. British Columbia’s share is 66,132 person-years including 35,864 during project development and 30,269 during operations. Alberta’s share is 24,926 person-years including 14,632 during project development and 10,293 during project operations.

