Latest Entries »

Phase 2, Merritt, BC flood remediation.

North of Nicola Avenue;

Pavi

Nicola Avenue enjoyed a new water and sewer in recent years: File Photo KDG

Returning to Merritt:

Source

We understand that residents in Phase 2 and Phase 3 areas are eager for more information about when they will be able to return home.

City of Merritt

The City of Merritt only has one operational well, which is supplying all the water for the entire City of Merritt. Residents of Phase 2 will be able to return home when the City of Merritt can provide clean drinking water and sewage services to this area.

There are three main challenges for the Phase 3 area:

  • The water supply needs to be increased, with at least one more functioning well.
  • The water pipes need to be flushed and checked for safety.
  • The sewage and drinking water distribution systems are tied together throughout the Phase 3 area.

Although there are properties in the Phase 3 area that were not directly affected by flooding, the downstream infrastructure has been heavily damaged, and in some cases destroyed. The City of Merritt is working hard to isolate these systems, repair, run bypasses, or replace them as necessary.

We ask for patience as we work as hard as we can to get them to a position where people can come home as soon as possible.

Visit our Return Home Webpage below for more information:

Return Home Plan

http://www.merritt.ca/returnhome/embed/#?secret=SMvvkxRSaF

On this Day: November 24th 1434

The Thames river freezes over.

London Bridge

TMX-Feature November 23rd, 2021,

OTTAWA/CALGARY, Alberta, Nov 15 (Reuters) – Canada’s Trans Mountain oil pipeline has been shut down temporarily because of rainstorms pounding parts of the province of British Columbia, the operating company said in a statement on Monday.

Reuters

TMX and local FN bands.

the regular Trans Mountain Pipeline activities ceased for intervention with flooding and emergency abatement. Some equipment showed up and assisted local FN with flood mediation.

Cliff Shackelly, and the Nooaitch band, had Trans Mountain equipment and personal remediation of bridges and roads last week after being cut off from the rest of the world by a flash flood from the flashy Coldwater river system. Another, Arnold Lampreau, Cheif says that Forestry brought in a road from Spius Creek, to relieve. Cliff Shackelly now works security at the Trans-Mountain Camp, according to Lampreau.

Fish traps on The Coldwater south of Colletville, and operated by the tribal association, of which the 300 odd members of the Nooitch band are members, are not accounted for at this time. The group takes returning Salmon Captive for enumeration and projections of fish stocks.

November 23rd 2021, Oil prices jump by 2.6 percent.

The US president authorized the use of the countries emergency oil reserve today. The announcement is credited to have made oil prices jump over 2 percent. West Texas light crude, the benchmark grade that Canadian oil from Edmonton is sold, went to $78.75 dollars PB. On a sense of supply concerns.

Parkland refinery Burnaby BC .

The parkland refinery in Burnaby BC processes crude from the Trans Mountain Pipeline and stopped its processes in response to the flooding and the lack of oil from the Transmountian Pipeline supply being stopped.

While still processing oil from storage and ships the shut down will be causing more flaring and noise for its Burnaby neighbors.

The Burnaby refinery is the last refinery in Western Canada, it was acquired by Parkland Limited in 2017, after being part of the Burnaby community since 1935. ” Keeping people moving on Land, Air and Sea”.

Flooding State of emergency different then Covid.

It should be obvious in BC that the savings of insurance premiums and the demand on fuel at lockdown times, enjoyed by BC people during the Hiadus from Covid-19 will be there for this situation. Be careful!

Transmountain pipeline delivers 300 thousand barrels of product a day from Edmonton to Burnaby. The expansion, (TMX,) will more than double that. The work is expected to be complete in December 2022,

It is expected that the 300 thousand barrels will be back online by the end of the week.

On this Day: November 23rd 1963

Doctor Who Premieres on BBC.

Guard your Spirit

Pipe for oil field File:Photo KDG

Highlights

25 percent of Children registered, get vaccinated system. ( 90,000)

5-11-year-olds vaccination.

The campaign starts Monday.

Consent.

Drop-ins are difficult at this time.

Adults not finished their own shot series, come in with kids ( immediate family needs)

Pharmacy-only for 12 and up…

Johnson and Johnson vector vaccine.

more…

From the Editor.

In order for a child to receive a pediatric COVID-19 vaccine, they must have verbal consent from either a parent or legal guardian — or written consent if they’re being accompanied by an adult who isn’t their legal guardian.

DH News

,

The City of Merritt is starting its recovery plan today at 12 noon, after finishing a rapid inspection program to classify damage and accessibility to property.

Roadblocks will remain in place at access points to the City.

PHASE ONE

Phase 1: North of the RCMP Station

We anticipate that the evacuation order for this phase will be lifted on Tuesday, November 23rd at 12:00 PM (noon).

Critical information for residents returning as part of phase 1:

  • The phase 1 area will be on “Evacuation Alert” status
  • The phase 1 area is on “Boil Water Notice”, meaning that all water must be boiled before it is consumed.
  • The City asks that residents be extremely conscious of water use, as the Kengard well is the only well currently feeding this system and minimizing water use is necessary to preserve fire flow.
  • Prior to return, residents should acquire sufficient food and supplies to be self-sufficient for 72 hours. Grocery stores in the phase 1 area are working to come online for November 23, 2021, though reduced hours may be in place and there is no guarantee on what products will be available.
  • Garbage and recycling service will commence the week of November 29th, 2021 (commercial service will begin immediately)
  • The City will be providing reduced levels of snow clearing service.
  • The City has reduced flows for fire protection, which is being partially offset by water tanker and water truck vehicles on standby.
  • Hydro, gas and internet utilities are all operational in the phase 1 area.
  • The City is coordinating with the School District, which is developing a plan for remote learning for students in our community, alongside a plan for returning to physical locations.
  • At the outset, the Nicola Valley Hospital and Health Centre will not be open. 9-1-1 services will be available with service to Kamloops. Interior Health is actively working on bringing additional health services online.

During this phase, roadblocks will remain on Voght Street at Grimmett Street, on Nicola Avenue at Juniper Drive, and on Nicola Avenue at Coldwater Road.

Access from Highway 8 to retail stores in the Northeast of Merritt will be via Juniper Drive. A reduced speed zone of 30 km/h will be implemented on Juniper Drive and Parker Drive (Figure 1 – Detour Route).

Highlights

Short 72 hour visits to US escape testing. (Fully vaccinated)

Canadians cooperating in challenges.

Stay safe stay warm…

My brain said, said, train, my feet said meet.
The end of it was incomplete.
But the, the, challenge  of place did not remake.
My best defence to for life and retake.

The rest may be all but sure; and then take the cure.
But me I want a sence of goal, and that may be you!
So stay intack untill I come to list your virtue too.
Safe and warm, set an alarm, for a proposal to woo. KDG November 21 2021
spirit come:

We meet again…

Merritt BC incorporation File: Photo KDG

BC flooding update November 20th, 2021.

Highlights

A new atmospheric river ranking system coming.

Three highways with travel restrictions.

Ten days fuel rationing to aid commercial traffic.

Goods movements.

Pinch points in traffic.

Farmers market food hubs.

Agricultural resilance.

Not aware of medication shortages. Veterinarians are available.

Be patient with others, follow orders.

On this Day: November 19th 1998

The impeachment of Bill Clinton, for lying about an affair with Monica Lewinski begins.

Failure…

Moon rising File photo KDG

Nov16-17th

On this Day: November 18th 1963

The first push-button phone.

I can’t tell you why.

ICBC and injury law,
File Photo KDG

Animation of the blood moon File photo KDG

Partial eclipse:

The moon will try another step in its dance with the shadow of our earth today at 00:57.27 AM, Pacific Daylight Time. A full lunar eclipse can only happen with a full moon. The moon appears full for a number of days each cycle every month, however, it is only completely full for a number of hours in each cycle. This can allow for a partial eclipse such as the one today. The 97 % and change eclipse will start at 10:00 PM PST on the 18th and end at 4:06 AM on the 19th

A lunar eclipse can only take place during the full moon. During a partial lunar eclipse, the Moon is partially covered by the shadow of the Earth and starts changing color to copper-red. This partial lunar eclipse will be visible in North, Central and South America, Asia and Australia. In Europe and Africa it will be partially visible. It can’t be seen in the Middle and Near East. It will be the longest partial lunar eclipse since the 15th century. 

Full moon info

On this Day: November 19th 1946

Afghanistan, Iceland, and Sweden join. the United nations.

Moonstruck

Moon at three quarter August Merritt BC
File Photo KDG

On this Day: November 17th 2012

Fifty Egyptian children were killed in a railway crossing accident..

Level crossings safety

Work is going on to open highways. Now is not the time to travel.

Monitor drive BC

Some flood warnings are still in effect.

Operational updates.