Our condolences to you.
We wish you a reasonable return to a sense of well being based on some present reality. PP
We wish you a reasonable return to a sense of well being based on some present reality. PP
One half a million booster doses given to priority populations.
Booster doses at least six months since 2nd dose, 8 months maybe optimal.
Invitations coming out soon to next groups.
Global action of important.
Genome testing of waste water challenging.
Holidays “keep it small”
Not contemplating anymore restrictions, because of immunization effectiveness in most areas.
More from Bonnie Henry and Adrian Dix
BC Mix
source
Supply chain road priorities.
Divers operate to the level of current conditions.
Flood watches in effect locations.
Nooksack river ,Whatcom county, Washington, state, not a expected to breach.
Meteorological, indicates drying trend into the weekend.
More…
OTTAWA/CALGARY, Alberta, Nov 15 (Reuters) – Canada’s Trans Mountain oil pipeline has been shut down temporarily because of rainstorms pounding parts of the province of British Columbia, the operating company said in a statement on Monday.
Reuters
TMX and local FN bands.
the regular Trans Mountain Pipeline activities ceased for intervention with flooding and emergency abatement. Some equipment showed up and assisted local FN with flood mediation.
Cliff Shackelly, and the Nooaitch band, had Trans Mountain equipment and personal remediation of bridges and roads last week after being cut off from the rest of the world by a flash flood from the flashy Coldwater river system. Another, Arnold Lampreau, Cheif says that Forestry brought in a road from Spius Creek, to relieve. Cliff Shackelly now works security at the Trans-Mountain Camp, according to Lampreau.
Fish traps on The Coldwater south of Colletville, and operated by the tribal association, of which the 300 odd members of the Nooitch band are members, are not accounted for at this time. The group takes returning Salmon Captive for enumeration and projections of fish stocks.
The US president authorized the use of the countries emergency oil reserve today. The announcement is credited to have made oil prices jump over 2 percent. West Texas light crude, the benchmark grade that Canadian oil from Edmonton is sold, went to $78.75 dollars PB. On a sense of supply concerns.
The parkland refinery in Burnaby BC processes crude from the Trans Mountain Pipeline and stopped its processes in response to the flooding and the lack of oil from the Transmountian Pipeline supply being stopped.
While still processing oil from storage and ships the shut down will be causing more flaring and noise for its Burnaby neighbors.
The Burnaby refinery is the last refinery in Western Canada, it was acquired by Parkland Limited in 2017, after being part of the Burnaby community since 1935. ” Keeping people moving on Land, Air and Sea”.
It should be obvious in BC that the savings of insurance premiums and the demand on fuel at lockdown times, enjoyed by BC people during the Hiadus from Covid-19 will be there for this situation. Be careful!
Transmountain pipeline delivers 300 thousand barrels of product a day from Edmonton to Burnaby. The expansion, (TMX,) will more than double that. The work is expected to be complete in December 2022,
It is expected that the 300 thousand barrels will be back online by the end of the week.
On this Day: November 23rd 1963
Doctor Who Premieres on BBC.

The City of Merritt is starting its recovery plan today at 12 noon, after finishing a rapid inspection program to classify damage and accessibility to property.
Roadblocks will remain in place at access points to the City.
Phase 1: North of the RCMP Station
We anticipate that the evacuation order for this phase will be lifted on Tuesday, November 23rd at 12:00 PM (noon).
Critical information for residents returning as part of phase 1:
During this phase, roadblocks will remain on Voght Street at Grimmett Street, on Nicola Avenue at Juniper Drive, and on Nicola Avenue at Coldwater Road.
Access from Highway 8 to retail stores in the Northeast of Merritt will be via Juniper Drive. A reduced speed zone of 30 km/h will be implemented on Juniper Drive and Parker Drive (Figure 1 – Detour Route).
Work is going on to open highways. Now is not the time to travel.
Monitor drive BC
Some flood warnings are still in effect.
Operational updates.
The TMX project is ongoing, and the existing line will be running at capacity for the month of October 2021.

The volume of oil to run is at capacity, with 7 percent to be apportioned.
The energy sector around the world works on a monthly cycle. The Trans Mountain Pipeline is part of that cycle. Apportionment describes the amount of demand shippers place on the pipeline in excess of its available capacity. Here’s a step-by-step guide to the apportionment determination that’s carried out every month for the existing Trans Mountain Pipeline system.
TM today
The apportionment ( over capacity nominations) is sometimes up to 40 percent. This is a good indication that expansion is a good business plan.
The pipeline in use at this writing is the one that was built in 1958. The expansion project is building another line beside it.
Hugh Jackman, actor, born.
The TMX organisation took part in the UBCM, Union of British Columbia Municipalities Convention this September.
Ian Anderson, Trans Mountain president hosted a virtual breakfast for 23 mayors of impacted communities through Microsoft teams.; this was the sixth breakfast TMX has participated in at the
UBCM annual conventions.
A matched donation to the Red Cross, Registered Fire Appeals Fund was made by TMX in support of the wildfire situation during the fire season.

On this Day: September 28th 1825
The first passenger breaks the 15 MPH barrier, causing fear.